Operation Monitor; Operating Hours; Production Information - Mitsubishi R56TB Instruction Manual

Cr750/crn-700 series
Table of Contents

Advertisement

15.3.3.

Operation monitor

15.3.3.1. Operating hours

The robot operating time, and battery usage time, etc., can be confirmed.

15.3.3.2. Production information

The latest cycle, operation time, No. of cycles and average cycle time for each program in the robot controller
can be confirmed.
The production information is not constantly displayed. Tap on the [Refresh] button (<a>) as necessary.
The connected robot and
it's servo ON time can be
confirmed.
109
<a>

Advertisement

Table of Contents
loading

This manual is also suitable for:

R57tb

Table of Contents