Before Starting The Work (230V Ccn) - Canon iR2422 series Service Manual

Table of Contents

Advertisement

2.1.7 Before Starting the Work (230V CCN)

1-1 Points to Make Before Installation
Be sure to go through the following before starting the work:
1) If you are installing the machine after moving it from a cold to warm location, be sure to leave the machine unpacked for at least 2 hours so that the machine is
fully used to the site temperature, thus avoiding image faults caused by condensation. (The term "condensation" refers to the formation of droplets of water on
the surface of a metal object brought in from a cold to warm place, i.e., as the result of the rapid cooling of the moisture (vapor) around the object.)
2) The machine weighs a maximum of about 46.2 kg. Be sure to work in a group of 2 persons when lifting it.
1-2 Checking the Contents
Check to be sure that none of the following contents is missing:
[1]
Drum unit
[2]
Black toner
[3]
Power cable
[4]
Certificate of China
[5]
Cassette size label
*1: 2-cassette model: 2 pcs., 1-cassette model: 1 pc.
*2: Only if equipped with duplex unit
[1]
[4]
[7]
[9]
---1
---1
---1
---1
---2(1)
(*1)
[2]
A3
A4
A4
A5
B5
B5
LGL
11 17
LTR
STMT
8K
16K
A3
A4
A4
A5
B5
B5
LGL
11 17
LTR
STMT
8K
16K
Set the size detector lever to the
new paper size.
Placer I'indicateur de format sur
le nouveau format.
Bitte stellen Sie den Hebel zum
Erkennen des Papierformats auf
das neue Format ein.
Set the size detector lever to the
new paper size.
Placer I'indicateur de format sur
le nouveau format.
[8]
[10]
F-2-13
[6]
Caution lavel
[7]
China written guarantee
[8]
Service record
[9]
Reversal tray
[10]
Reversal tray (sub)
[3]
B4
LTR
[5]
B4
LTR
[6]
---2(1)
---1
---1
---1
---1
Chapter 2
0020-4253
(*1)
(*2)
(*2)
2-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir2318 seriesIr2420 seriesIr2320 series

Table of Contents