Unpacking And Installation; Before Starting The Work - Canon iR5000 Service Manual

Hide thumbs Also See for iR5000:
Table of Contents

Advertisement

2. Unpacking and Installation

2.1 Before Starting the Work

Be sure to observe the following when installing the machine:
1. If the machine is moved from a cold to warm place for installation, con-
densation can occur in its pickup/feed assembly. Leave the machine
alone without unpacking for an hour or more before starting the work.
(The term condensation refers to the formation of droplets of water on a
metal surface caused by rapidly cooling moisture in the air.)
2. If flights of stairs are used to move the machine into or out of the site of
installation, be sure to observe the following:
2.1 Take out the ADF assembly, fixing/feeding assembly, and duplexing
2.2 When lifting the machine, do not use its four grips (left, right); in-
2.3 The machine weighs 210 kg. Be sure to work in a group of four.
3. Shift up the two adjusters found on the machine's bottom (front) to
make sure that they are released. The adjusters can slip off while the
machine is being moved. Be sure to pay attention not to lose them.
4. Be sure to work in a group of three or more when installing the ma-
chine. When removing the pad and bottom plate, arrange one person at
the rear and one person at the front to hold the grips while one person
engages in removal.
COPYRIGHT © 2000 CANON INC.
Download Free Service Manual at http://printer1.blogspot.com
unit, and move them separately from the body.
stead, hold it by its four bottom corners.
2000 2000 2000 2000
CANON iR5000/iR6000 REV.0 JULY 2000
CHAPTER 3 INSTALLATION
3-3 S

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ir6000

Table of Contents