Geely FC Workshop Manual page 59

Table of Contents

Advertisement

30.
Install crankshaft front oil seal assembly.
(a) Coat a little MP grease on oil seal lip.
(b) Gently knock new oil seal in with special tool and ham-
mer until the seal surface is parallel and level with the
edge of timing chain cover.
Note: do not let oil seal mouth contact with foreign
matters.
31.
Install timing chain hood components.
(a) Eliminate all old seal materials from contact surface.
(b) As shown in the diagram, coat sealant on the edge
(diameter 3.5mm-4.5mm).
Sealant: silicon rubber flange sealant 1596 (Kesaixin
1596).
(c) Install timing chain hood with 12 bolts and nuts.
Torque:
Notes:
Eliminate all grease on contact surface.
After coating sealant, finish installation of timing chain
hood within 3 minutes.
After installing, do not refill engine oil within 2 minutes.
32.
Install chain tensioner components.
(a) Check o-ring is clean, and buckle on the hook as shown
in the diagram.
48
Engine mechanism - Timing chain assembly
Special
tool
Sealant
Sealant
concentration
Lifting
Entering
Hook
Pin
Sealant width
Chain cover
groove
Cylinder
head groove

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents