Geely FC Workshop Manual page 53

Table of Contents

Advertisement

73.
Install transmission assembly.
(a) Install transmission assembly.
Torque: bolt A:
Bolt B:
Bolt C:
(b) Install 6 bolts.
Torque:
74.
nstall starter mounting components.
Torque: bolt:
Nut:
75.
Install sub frame together with side member.
Install front mounting assembly and rear mounting
assembly.
Torque: front:
Rear:
76.
Install power steering pump assembly.
Torque:
77.
Install engine assembly together with
transmission assembly.
(a) Erect engine together with transmission assembly on
engine crane.
(b) Install engine assembly to vehicle.
(c) Temporarily install side member and 6 bolts.
(d) Install left engine mounting assembly.
Torque:
(e) Install right engine mounting assembly.
(f) Insert special tool into location hole on right side of sub
frame and vehicle.
(g) Temporarily lock bolt A at first, and then lock bolt B.
(h) Insert special tool into location hole on left side of sub
frame and vehicle.
(i) Temporarily lock bolt A at first, and then lock bolt B.
(j) Insert special tool into location hole on right side of sub
frame and vehicle, and then tighten bolts up to speci-
fied torque.
Torque: bolt A:
Bolt B:
42
Engine mechanism - Engine assembly
m
Special
tool
Special tool

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents