WaterLogic WL100 Operating, Installation And Service Manual page 22

Hide thumbs Also See for WL100:
Table of Contents

Advertisement

Pre‐installation and sanitization procedures as prescribed in this manual must be performed before 
installing the WL100 Water Treatment System. 
 
Always install indoors and place the Waterlogic WL100 Water Treatment System on a firm, flat and 
stable surface.     
 
1. Attach the water supply line to the 1/4" feed water inlet bulkhead fitting on the back of the unit.  
Waterlogic requires the use of a water pressure regulator.  Water feed pressure must be 
between 40‐60 psi.   Turn on the water supply and check for leaks.      
 
2. Check to ensure that the Red Heater and Compressor Switch is the O=OFF position.  
 
NOTE:  Switches have internal LED that illuminates when placed in I=ON position 
 
 
3. Connect the power cord to the back of the Waterlogic WL100 Water Treatment System and to a 
120 Volt supply. 
 
4. Fill the Cold Tank.  Hold a container under the dispensing faucet, press and hold Cold (Blue) 
dispensing button until a continuous flow of water is obtained.  Once a continuous flow is 
obtained, release the dispensing button.  Cold tank is now full.   
 
5. Fill the Hot Tank.  Hold a container under the dispensing faucet.  Press both of the Hot (Red) 
Dispensing buttons until a continuous flow of water is obtained.  Once a continuous flow is 
obtained, the Hot Tank is full.  
 
       CAUTION!  NEVER TURN ON HEATER BEFORE FILLING HOT TANK. 
Red Heater and Compressor Switch must be in the O=OFF position while the hot 
tank is empty.  Damage could occur within one minute and the overload (high limit) 
will require manual reset if heater is turned on with an empty hot tank.  
 
 
 
6. Move the Waterlogic WL100 Water Treatment System into its final operating position.  Be sure 
that a minimum of 2" clearance is maintained around both the sides and the back of the unit.  
This is important to allow proper airflow and heat exchange of refrigeration system.  
 
7. Level unit using the adjustable feet to level if necessary.  Never install on incline. 
 
 
 
8. Turn the Red Heater and Compressor Switch on I=ON position.   
 
 
 
9. When the unit has reached its Hot Temp Set Point, the heater will cycle off.   When the 
unit has reached its Cold Temp Set Point Temperature, the compressor will cycle off. 
 
10. Once the unit is at the target temperature(s), sample the water to ensure water meets 
expectations and additional rinsing or adjustment is not required.  
 
 
11. Check the WL100 Water Treatment System for any leaks.  External Leak Protection is always 
recommended. 
WL100 Operating, Installation, and Service Manual                     Page 22                                                 Revision: 5‐20‐2016 

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents