CHECKS AFTER INSTALLATION HAVE COMPLETED

Check the following items after completing installation.
Is there a short circuit with the intake air fl ow?
Is the insulation secure? (Refrigerant piping)
Are there any errors with the wiring?
Are the terminal screws loose? Tightening torque (Unit: N • m {kgf • m})
M4... 1.57 - 1.96 {0.16 - 0.2}, M5... 1.96 - 2.45 {0.2 - 0.25}.
Is the drain water fl owing smoothly?
Is the insulation material properly installed?
Is the earth wire securely connected?
Is the front panel and the indoor unit air conditioner fi rmly fi xed and was the installation completed without any leakage
from the refrigerant?
Are the indoor and outdoor units secured fi rmly installed with bolts at secured locations?

REGARDING DELIVERY TO THE CUSTOMER

Request the customer to review the instruction manual and explain the operating method for the product.
In addition, it is also recommended that regular inspection checks are agreed upon for maintenance.
User inspection places
Serviceman inspection
places
Refer to the installation instruction manual provided with the indoor unit for the specifications on
the indoor unit installation.
RUN pin
• Filter and grill cleaning
• Exterior cleaning
• Check the operating status
• Clean the drain pan or things related to the water discharge
• Heat exchanger cleaning
2-3
Outdoor main PCB
MODE pin
*MODE pin: factory setting is cooling operation mode.