Panasonic S-45PU1E5 Technical Data & Service Manual page 312

Table of Contents

Advertisement

1
Precautions for Installation in Heavy Snow Areas
(1)
The platform should be higher than the maximum snow depth +50 cm.
(2)
The 2 anchoring feet of the outdoor unit should be used for the platform, and the platform should be installed
beneath the air intake side of outdoor unit.
(3)
The platform foundation must be firm and the unit must be secured with anchor bolts.
(4)
In case of installation on a roof subject to strong wind, countermeasures must be taken to prevent the unit from
being blown over.
Dimensions of Snow / Wind-proof Ducting and Refrigerant Tubing Space for Installation
Min. 100
250
Air Intake
Platform (foundation)
Min. 100
Duct
249
Outdoor Unit
Unit: mm
Duct
About 1/2 of the unit height
1-302

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents