Section.15:.Linkage.installation - Hangar 9 T-34 Mentor 40 ARF Assembly Manual

Table of Contents

Advertisement

Section 15: Linkage Installation
Required Parts
•.Fuselage.assembly.
1
•.18
/
".pushrod.wire.
.
8
•.Nylon.clevis.(5).
•.Nylon.wire.keeper.(5).
•.Nylon.control.horn.(2).
•.Quick.connector
•.Quick.connector.backplate
•.3mm.x.6mm.machine.screw
1
•.23
/
".assembled.pushrod
.
4
1
•.24
/
".assembled.pushrod
.
2
Required Tools and Adhesives
•.Drill
•.Drill.bit:.1/16".(1.5mm),.3/32".(2.5mm)
•.Phillips.screwdriver.(small)
.Step 1
Slide.a.clevis.retainer.onto.a.nylon.clevis..Thread.a.clevis.
1
onto.the.24
/
".assembled.pushrod.a.minimum.of.10.
.
2
turns.
•.Wing.assembly
3
•.4
/
".pushrod.wire
.
4
•.Clevis.retainer.(5)
•.Rudder.control.horn
•.2-56.x.3/4".screw.(6)
.Step 2
Slide.the.pushrod.assembly.into.the.fuselage.from.the.
rear..Make.sure.the.pushrod.goes.through.the.center.hole.
in.the.fuselage.former..Attach.the.clevis.to.the.center.hole.
in.the.elevator.control.wire.
.Step 3
Center.the.elevator.servo.electronically.using.the.radio.
system..Install.a.servo.arm.onto.the.elevator.servo..Mark.
the.pushrod.where.it.crosses.the.holes.in.the.servo.arm.
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

T-34 mentor

Table of Contents