Preparation - Toshiba e-STUDIO170F Service Manual

Hide thumbs Also See for e-STUDIO170F:
Table of Contents

Advertisement

3.2

Preparation

3.2.1
Preparing Tools
Installation and maintenance of this machine require the following tools:
Phillips screwdriver (diameter 7 mm, length 120 mm)
Scissors or knife (used to cut the packing bands)
e-STUDIO170F Installation
3 - 2
January 2005 © TOSHIBA TEC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents