Toshiba e-STUDIO170F Service Manual page 312

Hide thumbs Also See for e-STUDIO170F:
Table of Contents

Advertisement

(4)
Rotate the operation panel assembly until the right boss of the operation panel assembly comes
to the release position. Then, lift the operation panel assembly and remove the right boss of the
operation panel assembly from the hinge.
(5)
Slide the operation panel assembly to the right, and remove the operation panel assembly.
Note:
After reassembling, perform the operation panel test referring to the
PANEL TEST [MENU], [9], [4], [01]"
e-STUDIO170F Removal/Replacement/Adjustment
Operation panel assembly
Fig.8-4
8 - 4
P.11-15 "[ 1 ] OPE.
January 2005 © TOSHIBA TEC

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents