Installing The Cable-Management Arm - IBM pSeries 630 6C4 Service Manual

Hide thumbs Also See for pSeries 630 6C4:
Table of Contents

Advertisement

Installing the Cable-Management Arm

To install the Model 6C4 cable-management arm, do the following:
1. Attach the cable carrier support bracket to the back of the chassis with two screws.
2. Place the two captive snap buttons, located on the cable-management arm, into the unlocked (pulled
out) position.
3. Align and insert the two captive snap buttons into the holes located on the cable carrier support
bracket. Push in on the head of the snap buttons to lock them into position.
1 Model 6C4
2 Cable Carrier Support Bracket
3 Captive Snap Button (Qty. 2)
4. Open the cable-management arm so that the hinged mounting plate lies flat against the
flange-mounting bracket.
5. Align the holes, located on the cable-management arm mounting plate, with the threaded holes on the
rack-flange mounting bracket. Secure the bracket with two screws.
Note: To avoid any binding of the cable-management arm, ensure that the cable-management arm is
level.
586
Eserver pSeries 630 Model 6C4 and Model 6E4 Service Guide
4 Rack Flange Mounting Bracket
5 Cable Management Arm

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pseries 630 6e4

Table of Contents