Installing The Cable-Management Arm And Connecting And Routing Power Cables - IBM Power System S822LC Installing The System And Ordered Parts

Hide thumbs Also See for Power System S822LC:
Table of Contents

Advertisement

1
2
Figure 7. Lifting the release latches and pushing the server into the rack
4. Install the screws on either side of the system to secure the system to the rack.
5. Attach the front cover to the front of the system.
Figure 8. The server installed in the rack
Installing the cable-management arm and connecting and routing
power cables
The cable-management arm is used to efficiently route cables so that you have proper access to the rear
of the system. After you have installed the cable-management arm, connect and route power cables.