Sharp AR-BC260 Service Manual page 42

Digital full color multifunctional system
Hide thumbs Also See for AR-BC260:
Table of Contents

Advertisement

f. Upper heat roller, bearing, gear
1) Remove the fusing unit from the machine.
2) Remove the lever (A), and release the roller pressure.
3) Remove the screw.
A
4) Open the upper fusing section.
5) Remove the heat roller upper unit (B).
B
∗ When assembling, put the flanges of the upper bearings outside
of the frames F and R.
Frame R
Frame R
6) Remove the C-ring and the bearing, and remove the gear (A)
g. Lower heat roller, bearing
1) Remove the fusing unit from the machine.
2) Remove the screw, and open the upper fusing section.
3) Remove the lower heat roller unit (B).
A
4) Remove the C-ring and the bearing (A), and remove the heat
h. Paper guide
1) Remove the fusing unit from the machine.
2) Remove the screw, and remove the paper guide.
Frame F
Note: Refer to the adjustment (ADJ13) when installing the paper
Frame F
AR-BC260 DESCRIPTIONS OF EACH SECTION 7 - 5
and the heat roller (B).
A
B
roller (B).
B
A
guide.
B
A

Advertisement

Table of Contents
loading

Table of Contents