Process Control; Overview; Process Control Steps; Six Steps - Ricoh B156 Service Manual

Gestetner, lanier, savin
Table of Contents

Advertisement

6.4 PROCESS CONTROL

6.4.1 OVERVIEW

The copier adjusts the following process control parameters:
• Development bias (V
• Charge corona grid voltage (V
These 2 parameters maintain a consistent gamma for the engine.
NOTE: This copier uses only the ID sensor. (There is no TD or potential sensor.)

6.4.2 PROCESS CONTROL STEPS

Six Steps

Depending on the machine's condition, some or all of the following steps may
occur:
: ID sensor calibration
: Color development bias initialization (M, then C, then Y)
: K development bias initialization
: M, C, Y, and K bias fine adjustment
: Charge grid bias voltage adjustment
: Process control interval counter reset
If the main power is turned off (or the cover opened) during a process control
session, the session is aborted. Turning the power on (or closing the cover)
restarts the process control session.

When is Process Control Done?

When an event arises, the specified steps are performed.
Event
Forced process
When forced process control is done (engine SP mode
control
3-001-1)
Process control
End of job: When more than 200 sheets have been
regular interval
printed upon completion of a job. (The interval can be
changed with engine SP3-003-1.) Black-and-white
outputs are not included in this count.
During a job: If the number of prints since process
control gets to 700, printing stops and process control is
done. The interval can be changed with engine SP 3-
003-1 [default: 200] and engine SP 3-003-2 [default:
500]. Change only SP 3-003-2 if you do not wish to
change the "end-of-job" interval.
Power on
When the fusing pressure roller temperature is 60 ° C or
lower immediately after the power is turned on.
Environmental
When the change in the temperature/humidity sensor
change
output since the previous process control exceeds a
certain value. SP3-004 can be used to change the
threshold temperature and humidity values.
B156/B220
CÓPIA NÃO CONTROLADA
)
B
)
G
Condition
6-16
CÓPIA NÃO CONTROLADA
PROCESS CONTROL
Steps
,
,
,
,
,
,
,
,
,
SM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents