Interconnecting Multiple Hubs - McDATA 316095-B21 - StorageWorks Edge Switch 2/24 Installation And Service Manual

Fabric switches
Hide thumbs Also See for 316095-B21 - StorageWorks Edge Switch 2/24:
Table of Contents

Advertisement

Diagnostics
3
McDATA® Sphereon 3032 and 3232 Fabric Switches Installation and Service Manual
3-52
11
Does the LAN configuration use multiple Ethernet hubs that are
daisy-chained?
YES
NO
Go to
12
Verify the hubs are correctly interconnected (refer to next figure).
a. At the first (top) Ethernet hub, verify:
1. An RJ-45 Ethernet patch cable connects to port 24.
2. The medium-dependent interface (MDI) switch is set to MDI
(in). If not, set the switch using a pencil or other pointed
instrument.
b. At the second Ethernet hub, verify:
1
4
1 3
1 6
1
1 3
1
1 3

Interconnecting Multiple Hubs

Figure 3-20
1. The patch cable from the first hub connects to port 12.
step
13.
5
8
9
1 2
1 7
2 0
2 1
2 4
4
5
8
9
1 2
1 6
1 7
2 0
2 1
2 4
4
5
8
9
1 6
1 7
1 2
2 0
2 1
2 4
MID
MDI X
1
1
M ID
MD IX
1
M ID
M D IX
1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sphereon 3032Sphereon 3232

Table of Contents