Packing The M7I Router For Shipment - Juniper M7I Hardware Manual

Multiservice edge router
Hide thumbs Also See for M7I:
Table of Contents

Advertisement

Packing the M7i Router for Shipment

Copyright © 2010, Juniper Networks, Inc.
Guidelines for Packing M7i Components for Shipment on page 194
To pack the router for shipment:
Retrieve the shipping crate and packing materials in which the router was originally
1.
shipped. If you do not have these materials, contact your Juniper Networks
representative about approved packaging materials.
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist and connect
2.
the strap to one of the ESD points on the chassis. Verify that the router is attached to
a proper earth ground.
Power off the router. See "Powering Off the M7i Router" on page 60.
3.
Disconnect power from the router: .
4.
Unplug the power cord from each power supply. See "Removing an M7i AC Power
Cord" on page 110
NOTE: When multiple AC power supplies are installed in the chassis,
each AC power cord (one for each power supply) must be unplugged
to disconnect power completely from the router.
See "Removing an M7I DC Power Cable" on page 115.
NOTE: All DC power cables must be disconnected to disconnect power
completely from the router.
Remove the cables that connect to all external devices. For instructions, see "Replacing
5.
the Routing Engine Interface Port Cables" on page 99 and "Removing an M7i PIC" on
page 89.
Remove all Field Replaceable Units (FRUs) from the router.
6.
Remove the router from the rack:
7.
If you are using a mechanical lift, place the lift platform under the router, unscrew
and remove the mounting screws from the rack, and move the router to the shipping
crate.
If you are not using a mechanical lift
If the router weight is fully supported by a shelf or another router, unscrew and
remove the mounting screws from the rack. Then, move it to the shipping crate.
If the router weight is not fully supported by a shelf or another router, one person
should grasp the router while another person unscrews and removes the mounting
screws from the rack. You can then move the router to the shipping crate.
Appendix G: Contacting Customer Support and Returning M7i Hardware
193

Advertisement

Table of Contents
loading

Table of Contents