HEIDENHAIN ITNC 530 User Manual page 453

Conversational programming
Hide thumbs Also See for ITNC 530:
Table of Contents

Advertisement

Set-up clearance Q200 (incremental value): Distance
between tool tip and the starting position in the tool
axis. If you are milling with machining strategy
Q389=2, the TNC moves the tool at the set-up
clearance over the current plunging depth to the
starting point of the next pass.
Clearance to side Q357 (incremental value): Safety
clearance to the side of the workpiece when the tool
approaches the first plunging depth, and distance at
which the stepover occurs if the machining strategy
Q389=0 or Q389=2 is used.
2nd set-up clearance Q204 (incremental value):
Coordinate in the tool axis at which no collision
between tool and workpiece (clamping devices) can
occur.
HEIDENHAIN iTNC 530
Example: NC blocks
71 CYCL DEF 232 FACE MILLING
Q389=2
;STRATEGY
Q225=+10
;STARTING PNT 1ST AXIS
Q226=+12
;STARTING PNT 2ND AXIS
Q227=+2.5
;STARTING PNT 3RD AXIS
Q386=-3
;END POINT IN 3RD AXIS
Q218=150
;1ST SIDE LENGTH
Q219=75
;2ND SIDE LENGTH
Q202=2
;MAX. PLUNGING DEPTH
Q369=0.5
;ALLOWANCE FOR FLOOR
Q370=1
;MAX. TOOL PATH OVERLAP
Q207=500
;FEED RATE FOR MILLING
Q385=800
;FEED RATE FOR FINISHING
Q253=2000
;F PRE-POSITIONING
Q200=2
;SET-UP CLEARANCE
Q357=2
;CLEARANCE TO SIDE
Q204=2
;2ND SET-UP CLEARANCE
453

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Itnc 530 e

Table of Contents