Juniper ACX1000 Hardware Manual page 75

Universal metro router
Hide thumbs Also See for ACX1000:
Table of Contents

Advertisement

Table 17: Site Preparation Checklist
Item or Task
Verify that your rack or cabinet meets the
minimum requirements for the installation
of the router.
Plan rack or cabinet location, including
required space clearances.
Secure the rack or cabinet to the floor and
building structure.
Cables
Acquire cables and connectors:
Determine the number of cables
needed based on your planned
configuration.
Review the maximum distance allowed
for each cable. Choose the length of
cable based on the distance between
the hardware components being
connected.
Plan the cable routing and management.
RELATED DOCUMENTATION
Installing and Connecting an ACX1000 or ACX1100 Router Overview | 93
(Continued)
For More Information
"Rack Requirements for
ACX1000 and ACX1100 Routers"
on page 78
"Cabinet Requirements for
ACX1000 and ACX1100 Routers"
on page 76
"Clearance Requirements for
Airflow and Hardware
Maintenance on ACX1000 and
ACX1100 Routers" on page 70
Performed By
Date
67

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acx1100

Table of Contents