Nortel Media Gateway 1000E PRI Installation And Comissioning Manual page 129

Hide thumbs Also See for Media Gateway 1000E PRI:
Table of Contents

Advertisement

Figure 32
IDA startup
2
3
4
5
Media Gateway 1000E PRI Gateway Installation and Commissioning
Copyright © 2007, Nortel Networks
.
To enable the PRI, enter:
LD 75
ENL DDCS loop
The response is:
OK
To enable the DCHI (NTAK93AB), enter:
LD 75
ENL DDSL n
The response is:
OK
STAT DDSL n
The response is:
ENBL IDLE (DCHI is enabled, but all channels are disabled.)
To enable the LAP protocols for each real and virtual channel
configured on the DPNSS1/DASS2 link, enter:
LD 75
STRT n
The response is:
OK, STARTING
The configured LAP protocols for each real and virtual channel
configured on the DPNSS1/DASS2 link are being enabled.
Both ends of the link should be started within five minutes of each
other. When this occurs, DTM301 is issued.
To check the status, enter:
Nortel Communication Server 1000
NN43041-311 01.01 Standard
Release 5.0 30 May 2007
DPNSS/DASS startup and status check 129

Advertisement

Table of Contents
loading

Table of Contents