Configuring And Cabling The Clock Controllers (Ntrb53) - Nortel Meridian 1 Succession 1000M Installation And Configuration Manual

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Page 162 of 376
Figure 70
CP PII Core/Net Module slot
Net
PS 0
1

Configuring and cabling the Clock Controllers (NTRB53)

553-3021-210
Standard 1.00
Cabling common equipment in a single group system
2
3
4
5
6
Two Clock Controller cards are required in each system to synchronize
functions.
The Clock Controllers cards must be installed as directed in the following two
rules.
1
Two Clock Controller cards must be installed in each system. The Clocks
must be connected to each other in Network Group 0.
2
The two Clock Controllers must be installed in Slot 9 of each Core/Net
module.
For Clock controller DIP-switch settings refer to Circuit Card: Description
and Installation (553-3001-211).
October 2003
7
8
9
10 11
Core
SYS
CP
cCNI
UTIL
PII
A
COM 1
C
Enb
B
Enb
Dis
Dis
COM 2
C
LAN 2
L
L
SB
U
INIT
RESET
ALRM SPKR
HDD PWR
c9 c10 c11 c12 c13 c14 c15 CP
553-9123r26revised
MMDU
LAN 1

Advertisement

Table of Contents
loading

Table of Contents