Installing overhead cable tray kits

Contents

Installing overhead cable tray kits
This section contains information on the following topic:
Installing overhead cable tray kits. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Cable trays (also called ladder racks) can hang from a ceiling, or they can be
mounted across the tops of the columns. If ceiling-hung racks are used, the
rear top cap grill on each column must be replaced with a Top Cap Cable
Egress Panel. The Cable Egress Panel has cutouts for cable routing. The cable
trays and the equipment required to hang them must be provided by the
customer and installed according to the manufacturer's instructions.
Nortel Networks offers an NT8D63 Overhead Cable Tray Kit that provides
equipment for mounting cable trays on the Large System columns. The kit
includes two support brackets, and front and rear exhaust grills with cutouts
for cable routing. The cable tray itself must be provided by the customer; it is
not included in the kit. Use this procedure to install the NT8D63 Kit.