Nortel Meridian 1 Succession 1000M Installation And Configuration Manual page 285

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Powering up the system and initial loading
3
Switch Cores and test the other side (Core/Net 0)
LD 135
SCPU
TEST CPU
STAT cCNI c s
TEST cCNI c s
STAT SUTL
TEST SUTL
TEST IPB
TEST LCD
TEST LED
4
Clear the display and minor alarms on both Cores.
CDSP
CMAJ
CMIN ALL
5
Get the status of the Cores, cCNIs, and memory.
STAT CPU
STAT cCNI c s
****
Switch cores.
Test the inactive Core/Net.
Get status of cCNI cards.
Test cCNI cards.
Get status of System Utility card.
Test System Util card.
Test Inter Processor Bus.
Test LCDs.
Test LEDs.
Clear the displays on the Cores.
Clear major alarms.
Clear minor alarms.
Get the status of both Cores and redundancy.
Get the status of all configured cCNIs cards.
Exit program.
End of Procedure
Large System
Page 285 of 376
Installation and Configuration

Advertisement

Table of Contents
loading

Table of Contents