Positioning And Leveling Equipment; Contents; Positioning And Leveling The Equipment - Nortel Meridian 1 Succession 1000M Installation And Configuration Manual

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Positioning and leveling equipment

Contents

Positioning and leveling the equipment

This section contains information on the following topic:
Positioning and leveling the equipment . . . . . . . . . . . . . . . . . . . . . . . .
Columns normally stand on adjustable feet that provide leveling capability
and ground isolation. However, casters are available and can be used for
two-tier columns. If a third module is added to a column with casters, the
casters must be replaced with leveling feet.
Note: If earthquake bracing is required, go to "Installing earthquake
bracing" on
page 297
and level equipment. When those procedures are complete, return to
Step 4 or Step 5 (as applicable) in the initial installation procedure.
Use Procedure 3 to position and level the equipment.
Procedure 3
Positioning and leveling the equipment
1
Check the equipment room floor plan to position columns.
2
Level the column.
a.
Remove the front and rear exhaust grills.
b.
Remove the front and rear air intake grills.
to install column and floor bracing, and to position
Large System
Page 47 of 376
Installation and Configuration
47

Advertisement

Table of Contents
loading

Table of Contents