Nortel Meridian 1 Succession 1000M Installation And Configuration Manual page 370

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Page 370 of 376
M
master switch settings, system monitor, 122
MDF (modular distribution frames), 99
backplane cable expansion, 104
I/O panel connections, 227
PFTU cross-connections, 116
PFTU terminations, 114
system monitor cabling, 127
Meridian 1 Option 61C CP PII, 27
Meridian 1 Option 81C CP PII, 27
Meridian 1 systems
upgrading, 32
MFA150 Modular Power Systems, 67, 69
modems, 135
connections, 143, 145, 146, 148, 149
modular power systems, 67
modules
adding between modules, 322
adding to columns, 315
adding to column top, 326
column height recommendations, 32
covers, 39
in columns, 20
power supplies, 288
mounting bolts
fourth modules, 41
module additions, 318, 319, 323, 330, 331
multiple column systems
ground and logic return distribution, 59
multiple-column systems
bracing rod installation, 309
ground and logic return distribution, 62, 91
spacer kits, 22, 48
system monitor cabling, 126
system monitor option switches, 121
multiple-row systems
superloop cabling, 220
553-3021-210
Standard 1.00
N
NE-A25B cable
network loops, 203
network modules
NT1R03 25DB M/F Extension Cable, 336
NT1R03 25DB M/M Extension Cable, 336
NT1R03 Max to IPE Modem Cable, 336
NT1R03 Shielded 4 Port Cable, 336
NT1R03 Shielded 4 Port with Ethernet Cable, 335
NT1R03 Shielded LAM Extension Cable, 336
NT1R04 Clock Controller to I/O Panel Cable, 337
NT1R05 Intercabinet Module Cable, 337
NT4N89AA, 158, 182
NT4R20 RSM Adapter Cable, 337
NT6D4405 CRT Cable, 337
NT6D4406 RSM Cable, 337
NT6D4407 GSP Cable, 338
NT6D4408 NVP Cable, 338
NT6D4410 CSL Cable, 338
NT6D4411 DVS Bus Node to Node Cable, 338
NT6D4412 DVS Bus Internal Cable, 338
NT6D4413 DVS Bus ESBC Terminator, 338
NT6D4414 DVS Bus Node 1 to 2 Cable, 338
NT6D4415 DVS Bus HABC Terminator, 339
NT6D4416 DVS Bus, Node 2 to 3 Cable, 339
NT6D504 LRE, 58
NT6D53 Junction Boxes, 75
NT6D54 QBL15 Field Wiring Kit (DC), 339
NT6D66 Call Processing Cards
October 2003
I/O panel connections, 227
PFTU connections, 116
cabling to another network module, 203
placement, 32
sysloads, 292
system terminal connections, 136

Advertisement

Table of Contents
loading

Table of Contents