Nortel Meridian 1 Succession 1000M Installation And Configuration Manual page 141

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Connecting a switch box and terminal to the SDI and CPSI/
COM1 ports
Use Procedure 20 to connect CPSI/COM1 ports to a switch box and a
terminal (see Figure 60 on
Procedure 20
Connecting a switch box and terminal to the SDI and CPSI/COM1 ports
1
Set the terminal to 9600 baud, 7 data, space parity, one stop bit, full
duplex, XON.
2
Connect an NT8D95 cable to the terminal and to the switch box.
3
Connect NT8D95 cables to a matching connector on the switch box.
When using an A0377992 ABCDE box, connect:
— CPU 0 to connector A.
— CPU 1 to connector B.
— The SDI port to connector D (connector C is common).
4
Connect NT8D95 cables from the switch box to J25 on the I/O panel in
the rear of each cPCI Core/Network Module.
5
Connect an NT8D95 cable from the switch box to the I/O panel slot for the
SDI card.
6
To communicate with the system in general, set the switch box to the SDI
port. To communicate directly with a CPSI COM1 port, switch the cable
as needed.
Connecting a system terminal or modem
page 140
End of Procedure
Large System
and Figure 61 on
page
Installation and Configuration
Page 141 of 376
142).

Advertisement

Table of Contents
loading

Table of Contents