Powering Up Dc Systems - Nortel Meridian 1 Succession 1000M Installation And Configuration Manual

Large system
Hide thumbs Also See for Meridian 1 Succession 1000M:
Table of Contents

Advertisement

Powering up dc systems

Installing the Security Device
Powering up the system and initial loading
5
Simultaneously turn the main circuit breakers for the two Core columns
ON.
6
For each Core column, verify the following:
The main circuit breaker in the pedestal did not trip OFF.
The main blower unit in each column is running.
The ringing generators are lit.
The red column LEDs in the top cap are lit. These LEDs will remain
red until the system reloads.
7
When the system is running, reattach all covers and panels to the
modules and columns. Module covers must be kept on so the air from the
pedestal fans will be directed up through all the modules and out the
exhaust vents in the top cap. When the module covers are removed, the
upper modules are not cooled properly because the air escapes from the
open module door.
If the module covers are left off and the system overheats, circuit cards
will malfunction and, in extreme cases, melt.
Powering up ac systems involves:
1
"Installing the Security Device" on
2
"Preparing to power up" on
3
"Turning dc power ON" on
The Security Device (Figure 106 on
battery and is shipped with the software package. This device, along with the
Keycode Installation diskette, enables the features for each individual system.
End of Procedure
page 269
page 270
page 271
page
265) resembles a large watch
Large System
Installation and Configuration
Page 269 of 376

Advertisement

Table of Contents
loading

Table of Contents