Heating - Trane IntelliPak with Symbio 800 Programming Manual

20 to 75 tons with the td7 display
Hide thumbs Also See for IntelliPak with Symbio 800:
Table of Contents

Advertisement

Table 3.
Cooling
Outdoor Air Damper Position
Economizing
Economizer Airside Enable Active
Economizer Decision Method
Econ Enable Min Outdoor Air Temp
Setpoint
Outdoor Air Temperature Active
Outdoor Air Humidity Active
Outdoor Air Enthalpy Active
Return Air Temperature
Return Air Humidity
Return Air Enthalpy
Mixed Air Temperature EvapA
Mixed Air Temperature EvapB
Mixed Air Temperature Estimated
Evap Leaving Air Temperature EvapA Starts Cprsr1C
Evap Leaving Air Temperature EvapB Running Time Cprsr1A
Evap Leaving Air Temperature
Estimated
Occupied Standby Cooling Setpoint
Active
Dehumidification Control Status
Discharge Air Cooling Setpoint Active Cond Cooling Valve Pos Pct Ckt1

Heating

Touch the Heating button to view Heating status information in the table below.
The data presented in this table is unit configuration dependent.
Table 4.
Heating
Heating Capacity Primary Status
Space Temp Heating Setpoint Status
Discharge Air Temperature Active
Discharge Air Heating Setpoint Status
Space Temperature Active
Occupied Heating Setpoint Active
Unoccupied Heating Setpoint
Morning Warmup Setpoint
Daytime Warmup Setpoint
RT-SVP011E-EN
Cooling, Circuit 1 and Circuit 2 level status (continued)
Cooling - Circuit 1
Discharge Pressure Ckt1
Discharge Saturated Temperature Ckt1 Suction Temperature Evap2B
Suction Temperature Evap1B
Condenser Air Flow Ckt1
EXV Status Percent Evap1A XXX.X%
EXV Status Percent Evap1B
Condenser Fan Relay 1 Ckt1
Condenser Fan Relay 2 Ckt1
Condenser Fan Relay 3 Ckt1
Condenser Fan VFD Run Command
Ckt1
Condenser Fan VFD Percent Freq Cmd
Ckt1
Hot Gas Bypass Valve Status Percent
Ckt1
Starts Cprsr1A
Starts Cprsr1B
Running Time Cprsr1B
Running Time Cprsr1C
Cond Reheat Valve Pos Pct Ckt1
Reheat Pumpout Relay Enable
Heating status
TD7 Display
Cooling - Circuit 2
Discharge Saturated Temperature Ckt2
Condenser Air Flow Ckt2
EXV Status Percent Evap2A XXX.X%
EXV Status Percent Evap2B
Condenser Fan Relay 1 Ckt2
Condenser Fan Relay 2 Ckt2
Condenser Fan Relay 3 Ckt2
Condenser Fan VFD Run Command
Ckt2
Condenser Fan VFD Percent Freq Cmd
Ckt2
Hot Gas Bypass Valve Status Percent
Ckt2
Starts Cprsr2A
Starts Cprsr2B
Starts Cprsr2C
Running Time Cprsr2A
Running Time Cprsr2B
Running Time Cprsr2C
Cond Reheat Valve Pos Pct Ckt2
Cond Cooling Valve Pos Pct Ckt2
31

Advertisement

Table of Contents
loading

Table of Contents