Trane IntelliPak with Symbio 800 Programming Manual page 19

20 to 75 tons with the td7 display
Hide thumbs Also See for IntelliPak with Symbio 800:
Table of Contents

Advertisement

2. Touch the report that you want to edit.
Figure 13. Editing a Custom Report
data category
that displays
in the panel
Scroll the list
of items on
the screen up
or down two
Changing the Order of Items in a Custom Report
Items in a custom report can be rearranged according to personal preference by using the editing
tools as described in Editing a Custom Report.
For example, you created the custom report shown in
item "Supply Fan Speed Command" to the top left portion of the report.
To change the order for the example described above:
1. Touch the Edit button on the Custom Report screen.
2. Use the arrow buttons to locate the item to be reordered. When located, touch the item which
3. Use the arrow buttons to move the highlighted item to the top of the list (number 1 position).
4. Touch Save. You will be returned to the Custom Report screen, where the reordering changes
Note: On the TD7 display, report items are ordered from left to right with the first item appearing
The model in
screen. Use this model to accurately reorder items in your custom reports.
RT-SVP011E-EN
Follow steps 2 through 4 in
Select the
below
lines.
will then be highlighted blue (see
now appear.
at the top left portion of the screen. Up to nine items can appear on each Custom Report
screen with a maximum of 4 screens and 36 items per report.
Figure 14
depicts a custom report screen with the first nine items displayed on the
"Creating a Custom Report," p.
Figure 12, p.
Figure
13).
TD7 Display
17. to complete your edits.
Scroll the list
of items on
the screen up
or down two
lines.
18, but would prefer to move
19

Advertisement

Table of Contents
loading

Table of Contents