▶
"Connecting the power cord" on page
▶
"Switching on the server" on page
▶
"Resuming BitLocker functionality" on page
10.5
Replacing memory modules
Upgrade and Repair Unit
(URU)
Tools:
tool-less
CAUTION
▶
Use only released configurations to ensure a faultless operation of
the system.
▶
Before changing the memory configuration, verify if the
configuration is released. Please contact your sales outlet or our
customer service center.
Preliminary steps
▶
"Locating the defective server" on page
▶
"Suspending BitLocker functionality" on page
▶
"Shutting down the server" on page
▶
"Disconnecting the power cord" on page
▶
"Getting access to the component" on page
▶
"Removing the system air duct" on page
▶
"Locating the defective component" on page
Removing the defective memory module
▶ Remove the memory module, see
page
404.
TX2550 M5
82.
83.
49.
"Removing a memory module" on
Upgrade and Maintenance Manual
130.
Hardware: 5 minutes
47.
107.
50.
51.
67.
48.
Main memory
405