Gradient Upload Commands - Single-Pump Flow Gradient - Teledyne SyriXus 65x Installation And Operation Manual

Syringe pumps
Table of Contents

Advertisement

SyriXus Series Pumps Installation and Operation Guide
Section 8 Serial Interface
Step Number 01:
LGUL,F:xx,S:01,FL:xxx.xxxx,I %:xx.xx,F %:xx.xx,D:xxxx.x,
Step Numbers 02 through 99:
LGUL,F:xx,S:xx,I %:xx.xx,F %:xx.xx,D:xxxx.x,
Figure 8-9 Gradient upload commands - single-pump flow gradient
EAR99 Technology Subject to Restrictions Contained on the Cover Page
8-32
Gradient Total Flow Rate
Units = milliliters/minute
Range = (000.0000 – Maximum Flow Rate)
Step Number 01
File (01 – 99)
Final Gradient Percentage
Initial Gradient Percentage
Range = (00.00 – 100.0)
Step Number (02 – 99)
File (01 – 99)
Gradient Duration
Final Gradient Percentage
Range = (00.00 – 100.0)
Initial Gradient Percentage
Range = (00.00 – 100.0)
Gradient Duration
Range = (0000.1 – 9999.0 minutes)
Range = (00.00 – 100.0)
Range = (0000.1 – 9999.0 minutes)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Syrixus 260xSyrixus 500xSyrixus 500xvSyrixus 1000x

Table of Contents