Figure 76. Cable management fingers installed on rack uprights
1 - Cable management finger assemblies
Procedure
1. Remove the cables from the cable management finger assembly and rearrange the cables around the
assembly.
2. Unscrew and save the three (3) screws holding the finger assembly to the rack upright. Support the
assembly to prevent it from falling.
3. Remove the cable management finger assembly.
4. If necessary, repeat steps 1 through 4 for the other finger assembly.