Omron FZ3 Series User Manual page 115

Vision sensor
Table of Contents

Advertisement

Item
Scene
Specify startup
scene, scene group
Scene Group
Scene
Select startup mode
Measurement manager
bar state
Operation priority
Measurement
initialization priority
Communication module
select
FZ3 User's Manual
Set value
[Factory default]
The selected scene/scene group will be the
Checked
scene/scene group at start-up.
The scene/scene group set in the controller
[Unchecked]
when "Data save" is executed will be the
scene/scene group at start-up.
Scene groups 0 to 31
Selects the scene group displayed at
[Scene group 0]
start-up.
Scenes 0 to 31
Selects the scene displayed at start-up.
[Scene 0]
[ADJUST]
Selects whether the ADJUST window or
RUN
RUN window is displayed at start-up.
[Open]
Selects whether to display the measurement
Close
manager bar at start-up.
Specifies whether measurement results
display or menu operation is to have priority.
Measurement results display processing will
[Measurement result
have priority over menu operation.Menu
priority]
operation will be harder to receive due to its
lowered priority status.
Menu operation is prioritized.Measurement
Menu operation priority
results display may be incomplete.
Measurement initialization is performed
immediately after scene switching or flow
editing.Specifies whether measurement
trigger receipt or screen re-drawing
processing has priority during measurement
initialization.
Measurement trigger reception is prioritized
even during processing, including
[Measurement trigger
measurement processing. Display for
receipt priority]
screen re-drawing processing may be
incomplete due to its lowered priority status.
Screen re-drawing processing is prioritized.
Processing of re-drawing
Measurement triggers will not be received
on screen priority
until screen re-drawing processing is
complete.
Setting the System Operation Environment
Description
5
113

Advertisement

Table of Contents
loading

Table of Contents