Before You Begin; Site Preparations - ADC SG-1 User Manual

Adc telecommunication user manual service gateway system sg-1
Table of Contents

Advertisement

Chapter 1: Overview
The SG-1 comprises two types of system chassis: 1U and 10U. The 1U chassis (or Mini System Chassis) has 2
service creation slots and 1 power supply slot built into the chassis. The 10U chassis (or Full-Size System Chassis)
has 16 service creations slots and 4 power supply slots for load sharing redundancy (see
B
Y
B
EFORE
OU
EGIN
Before installing the SG-1 chassis and its associated modules, it is important to prepare for installation by:
• Preparing the site (site preparations) and reviewing the installation plans.
• Establish a Method of Procedure (MOP).
• Unpacking and inspecting the system components.
• Gathering the tools to properly install the SG-1 chassis and its associated modules.
S
P
ITE
REPARATIONS
Typically, you should have prepared the installation site beforehand. As part of your preparation, obtain a plan of the
site or Telco environment where the SG-1 chassis will be installed. All personnel involved in the installation of the
SG-1 chassis, including installers, engineers, and supervisors, should participate in the preparation of a MOP for
approval by the customer.
Method of Procedure
An example of a pre-installation checklist of tasks and considerations (Method of Procedure) that needs to be
addressed and agreed upon before proceeding with the installation is given below:
• Assign personnel.
• Determine protection requirements for personnel, equipment, and tools.
• Evaluate potential hazards that may affect service.
• Schedule time for installation.
• Determine any power and space requirements.
1-2
Figure 1-1. SG-1 10U
June 30, 2006
Figure
1-1).
SG1-UM-8500-03

Advertisement

Table of Contents
loading

Table of Contents