5.2 Drive configurations
Booting from the second hard disk drive
In order to allow booting from the second hard disk drive, you need to configure it as the
primary boot device (Boot Option #1). Make the following settings in your BIOS setup:
1. Select the "Boot" tab.
2. In the "Boot Option Properties" area, select the first entry from the list: "Boot Option #1"
and press the Return key.
3. Select the corresponding drive (slave drive) in the "Boot Option #1" window, e.g.
STxxxxxxxxx, and press the Return key.
The second hard disk drive (slave drive) becomes the primary boot device.
Note
The drive letters for the partitions on both drives are assigned by the operating system in
use. You can change these in the Control Panel as required.
5.2.2

RAID systems

5.2.2.1

Manage RAID system

RAID system management functions
The following options are available for setting up a RAID system:
● RAID of the mainboard
● Hardware RAID of a RAID controller
● In devices with pre-installed Windows operating system: Software RAID with data storage
media management, see section "Manage onboard RAID system (Page 46)".
Detailed information on drive replacement is available in section "Expansion and parameter
assignment of device", "Replace defective hard disk in RAID system".
Note
A hard disk can be synchronized at operating system level if a fault is detected. It may take a
very long time to synchronize a new hard disk in the background, depending on the size of
the hard disk and on the system load. It may take several hours or even days in the case of
extremely high hard disk load. Guide value for duration: < 3 h with 90% HDD system load
and RAID5 with HDD 1 TB.
The safe system states RAID Level, for example, 1 are only reached once synchronization
has been successfully completed. In addition, system performance may be limited in the
case of a manually started maintenance operation until completion of the maintenance
phase.
42
Operating Instructions, 07/2019, A5E45118479-AB
SIMATIC IPC1047

Advertisement

Table of Contents
loading

Table of Contents