I/O Communication Characteristics
PROFIBUS DP Cycle <
PLC Cyclic Refresh
Instruction
PLC Cycle
Execution
Slave I/O data refresh
PROFIBUS Cycle
Slave I/O data refresh
T
IN
ON
T
Slave device Input ON (OFF) delay.
IN
T
PROFIBUS I/O data exchange cycle time
PB,Cyc
(See Appendix A Bus Parameters)
T
I/O Processing time in the Master Unit. Minimum value is 430 µs,
M,Proc
but may increase with increasing I/O data size.
T
Master request cyclic refresh until actual start of cyclic refresh.
M,Rrf
T
PLC cycle time (See section 6-5-5 PLC Cycle Time Performance).
PLC,Cyc
T
PLC cyclic refresh time (See section 6-5-5).
PLC,Rf
T
Slave device Output ON (OFF) delay.
OUT
The total I/O response time is the sum of all components:
T
= T
+ 4*T
IO
IN
PB,Cyc
Note The calculation assumes the presence of only one Master Unit on the PROFI-
BUS network.
The figure below shows the timing in case the PROFIBUS DP cycle < PLC
cyclic refresh.
Instruction
Execution
T
T
PB,Cyc
PB,Cyc
T
+ T
M,Proc
M,Rrf
T
Slave device Input ON (OFF) delay.
IN
T
PROFIBUS I/O data exchange cycle time
PB,Cyc
(See Appendix A Bus Parameters)
T
I/O Processing time in the Master Unit.
M,Proc
T
Master request cyclic refresh until actual start of cyclic refresh.
M,Rrf
T
PLC cycle time (See section 6-5-5 PLC Cycle Time Performance).
PLC,Cyc
T
PLC cyclic refresh time (See section 6-5-5).
PLC,Rf
T
Slave device Output ON (OFF) delay.
OUT
The total I/O response time is the sum of all components:
T
= T
+ 4*T
IO
IN
PB,Cyc
+ 2*T
+ T
+ 2*T
M,Proc
M,Rrf
Instruction
Instruction
Execution
Execution
T
T
PLC,Cyc
PLC,Cyc
+ 2*T
+ T
+ 2*T
M,Proc
M,Rrf
Section 6-5
+ T
+ T
PLC,Cyc
PLC,Rf
OUT
Instruction
Execution
T
T
PB,Cyc
PB,Cyc
T
M,Proc
T
PLC,Rf
+ T
+ T
PLC,Cyc
PLC,Rf
OUT
T
OUT
ON
179

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sysmac cj-seriesSysmac cj1w-prm21Sysmac cs1w-prm21

Table of Contents