Nortel Remote Office 9150 Installation And Administration Manual page 145

Hide thumbs Also See for Remote Office 9150:
Table of Contents

Advertisement

September 2001
What's next?
If the power-up cycle completes successfully (indicated by a lit Status LED),
your hardware installation is successful. Continue with "Installing the software"
on page 122.
If the power-up cycle was not successful (indicated by the Status LED going
out), contact your Nortel Networks distributor. There is a possible hardware
problem.
Installation and Administration Guide
Installing the Remote Office 9150 unit
121

Advertisement

Table of Contents
loading

Table of Contents