Make Primary Les Active; Fep: Force Elan To Primary - 3Com CoreBuilder 9000 User Manual

Atm enterprise switch
Hide thumbs Also See for CoreBuilder 9000:
Table of Contents

Advertisement

266
C
9: M
HAPTER
ANAGING
Make Primary LES
Active
LAN E
MULATION
Reestablish the primary LES of the ELAN as the active LES. When the
secondary LES of an ELAN is active instead of the primary LES, this
command causes LECs to be released from the secondary LES to join the
primary LES. Specify the ELAN name of the primary LES.
A secondary LES becomes the active LES on the failure of the primary LES
and it remains active even when the primary LES recovers. For more
information, see "Failure Recovery — Transferring Control to the
Redundant LES" on page 396.
To perform this command, the ELAN must be in secondary state and it
must be redundant.
You need to perform this command on all CoreBuilder 9000 ATM
Enterprise Switches with active LECS and verify the result.
Command Actions
Enter menu sequence:
Enter a parameter at the prompt
Parameter
ELAN name
Direct access sequence:
Command Result
System action taken:
System message display:
(2) LEM: LAN Emulation
(1) LCS: LE Configuration Services
(5) LNT: LECS Network topology
(9) RDN: LE Service redundancy

(3) FEP: Force Elan to Primary

Format or Range
Up to 32 characters. (For more information, see
"Display ELANs" on page 245.)
2 1 5 9 3 [parameter]
The primary LES of the specified ELAN becomes the
active LES.
Force to Primary message sent to LECS

Advertisement

Table of Contents
loading

Table of Contents