Pre-Delivery Preparation - Genie Z-60/34 Service Manual

Hide thumbs Also See for Z-60/34:
Table of Contents

Advertisement

Pre-Delivery Preparation

November 2003
Fundamentals
It is the responsibility of the dealer to perform the
Pre-delivery Preparation.
The Pre-delivery Preparation is performed prior to each
delivery. The inspection is designed to discover if anything
is apparently wrong with a machine before it is put into
service.
A damaged or modified machine must never be used. If
damage or any variation from factory delivered condition is
discovered, the machine must be tagged and removed from
service.
Repairs to the machine may only be made by a qualified
service technician, according to the manufacturer's
specifications.
Scheduled maintenance inspections shall be performed by
qualified service technicians, according to the
manufacturer's specifications and the requirements listed in
the responsibilities manual.
Genie Industries USA
18340 NE 76th Street
PO Box 97030
Redmond, WA 98073-9730
(425) 881-1800
Part No. 75861
Copyright © 2002 by Genie Industries. Genie® is a registered trademark of Genie Industries.
Rev A
Instructions
Use the operator's manual on your machine.
The Pre-delivery Preparation consists of completing the
Pre-operation Inspection, the Maintenance items and the
Function Tests.
Use this form to record the results. Place a check in the
appropriate box after each part is completed. Follow the
instructions in the operator's manual.
If any inspection receives an N, remove the machine from
service, repair and re-inspect it. After repair, place a check
in the R box.
Legend
Comments
Pre-Delivery Preparation
Pre-operation inspection completed
Maintenance items completed
Function tests completed
Model
Serial number
Date
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Genie UK
The Maltings, Wharf Road
Grantham, Lincolnshire
NG31- 6BH England
(44) 1476-584333
Genie Z-60/34
Section 3 • Scheduled Maintenance Procedures
Y = yes, completed
N = no, unable to complete
R = repaired
Y
N
R
3 - 3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents