Dürkopp Adler 550-867 Operating Instruction page 156

Hide thumbs Also See for 550-867:
Table of Contents

Advertisement

154
Scheduling a needle check
To schedule the time for the next needle check:
1.
Open the needle database ( p. 153).
2.
Tap the Checked button.
 The display switches to:
Fig. 123: Scheduling a needle check
3.
Check the needle.
4.
Enter the date of the next check.
5.
Confirm with OK.
Registering a needle change
To register a needle change:
1.
Open the needle database ( p. 153).
2.
Tap the Exchange button.
 The display switches to:
Fig. 124: Registering a needle change
3.
Change the needle ( p. 26).
4.
Modify the data if necessary.
5.
Confirm with OK.
Operating Instructions 550-867 - 00.0 - 11/2016
Programming

Advertisement

Table of Contents
loading

Table of Contents