Table 27: Clearance Requirements For The Srx550 High Memory Services - Juniper SRX550 Hardware Manual

Highmemoryservicesgateway
Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

Related
Documentation
Copyright © 2016, Juniper Networks, Inc.
For service personnel to remove and install hardware components, there must be
adequate space at the front and back of the services gateway as indicated in
Table 27 on page
59.
If you are mounting the services gateway in a rack with other equipment, ensure that
the exhaust from other equipment does not blow into the intake vents of the chassis.
Table 27 on page 59
provides information about the clearance requirements for
maintaining optimum airflow and the distances to facilitate easy maintenance of the
services gateway.

Table 27: Clearance Requirements for the SRX550 High Memory Services

Gateway
Location
Front of the chassis
Rear of the chassis
Between front-mounting flange
and rack or cabinet edge
Between both sides of the
chassis and any
non-heat-producing surface
such as a wall or cabinet side
SRX550 High Memory Services Gateway Description on page 3
SRX550 High Memory Services Gateway Cabinet Size and Clearance Requirements
on page 61
Site Preparation Checklist for the SRX550 High Memory Services Gateway on page 47
SRX550 High Memory Services Gateway Rack Size and Strength Requirements on
page 57
General Site Installation Guidelines for the SRX550 High Memory Services Gateway
on page 49
Recommended
Clearance
Requirement for Clearance
8.7 in. (22 cm)
Space for service personnel to remove
and install hardware components
17.4 in. (44.2 cm)
Space for service personnel to remove
and install hardware components
2.5 in. (6.35 cm)
Space for cable management and
organization
6.0 in. (15.24 cm)
Space for the cooling system to
function properly and to maintain
unrestricted airflow around the chassis
Chapter 7: Rack Requirements
59

Advertisement

Table of Contents
loading

Table of Contents