Clearance Requirements For Airflow And Hardware Maintenance Of The Srx550 High Memory Services Gateway - Juniper SRX550 Hardware Manual

High memory services gateway
Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

Clearance Requirements for Airflow and Hardware Maintenance of the
SRX550 High Memory Services Gateway
When planning the installation site for the SRX550 High Memory Services Gateway, you need to allow
sufficient clearance around the rack.
When planning the installation site for the services gateway, consider the following:
For the cooling system to function properly, the airflow around the chassis must be unrestricted.
Figure 13 on page 60
Figure 13: Airflow Through the Chassis
For service personnel to remove and install hardware components, there must be adequate space at the
front and back of the services gateway as indicated in
If you are mounting the services gateway in a rack with other equipment, ensure that the exhaust from
other equipment does not blow into the intake vents of the chassis.
Table 20 on page 61
provides information about the clearance requirements for maintaining optimum
airflow and the distances to facilitate easy maintenance of the services gateway.
shows the direction of airflow through the chassis.
Table 20 on page
61.
60

Advertisement

Table of Contents
loading

Table of Contents