Gateway - Juniper SRX550 Hardware Manual

Highmemoryservicesgateway
Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

Related
Documentation
General Site Installation Guidelines for the SRX550 High Memory Services Gateway
Copyright © 2016, Juniper Networks, Inc.
Table 25: Site Preparation Checklist for SRX550 High Memory Services
Gateway Installation (continued)
Item or Task
Additional Information
Review the
maximum distance
allowed for each
cable. Choose the
length of cable
based on the
distance between
the hardware
components being
connected.
Plan the cable
routing and
management.
SRX550 High Memory Services Gateway Chassis on page 13
Installation Overview for the SRX550 High Memory Services Gateway on page 87
General Site Installation Guidelines for the SRX550 High Memory Services Gateway
on page 49
The following precautions help you plan an acceptable operating environment for your
SRX550 High Memory Services Gateway and avoid environmentally caused equipment
failures:
For the cooling system to function properly, the airflow around the chassis must be
unrestricted. Allow sufficient clearance between the front and back of the chassis and
adjacent equipment. Ensure that there is adequate circulation in the installation location.
Follow the ESD procedures to prevent any damage equipment. Static discharge can
cause components to fail completely or intermittently over time. For more information,
see
"Preventing Electrostatic Discharge Damage to the SRX550 High Memory Services
Gateway" on page
194.
Ensure that the blank panels are installed into empty slots to prevent any interruption
or reduction in the flow of air across internal components.
NOTE:
Install the services gateway only in restricted areas, such as dedicated
equipment rooms and equipment closets, in accordance with Articles 110–16,
110–17, and 110–18 of the National Electrical Code, ANSI/NFPA 70.
Chapter 6: Planning and Preparing the Site
Performed
By
Date
Notes
49

Advertisement

Table of Contents
loading

Table of Contents