Rack Requirements For The Srx550 High Memory Services Gateway; Rack-Mounting Requirements And Warnings - Juniper SRX550 Hardware Manual

High memory services gateway
Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

Table 20: Clearance Requirements for the SRX550 High Memory Services Gateway
Location
Front of the chassis
Rear of the chassis
Between front-mounting flange and
rack or cabinet edge
Between both sides of the chassis and
any non-heat-producing surface such
as a wall or cabinet side

Rack Requirements for the SRX550 High Memory Services Gateway

IN THIS SECTION

Rack-Mounting Requirements and Warnings | 61

SRX550 High Memory Services Gateway Rack Size and Strength Requirements | 66
SRX550 High Memory Services Gateway Spacing of Mounting Bracket and Flange Holes | 67
Rack-Mounting Requirements and Warnings
Ensure that the equipment rack into which the services gateway is installed is evenly and securely supported
to avoid hazardous conditions that could result from uneven mechanical loading.
Recommended
Clearance
Requirement for Clearance
8.7 in. (22 cm)
Space for service personnel to remove and
install hardware components
17.4 in. (44.2 cm)
Space for service personnel to remove and
install hardware components
2.5 in. (6.35 cm)
Space for cable management and organization
6.0 in. (15.24 cm)
Space for the cooling system to function
properly and to maintain unrestricted airflow
around the chassis
61

Advertisement

Table of Contents
loading

Table of Contents