Table 13: Clearance Requirements For The Srx550 Services Gateway - Juniper SRX550 Hardware Manual

Hide thumbs Also See for SRX550:
Table of Contents

Advertisement

Related
Documentation
Copyright © 2015, Juniper Networks, Inc.
Table 13 on page 45
provides information about the clearance requirements for
maintaining optimum airflow and the distances to facilitate easy maintenance of the
services gateway.

Table 13: Clearance Requirements for the SRX550 Services Gateway

Location
Front of the chassis
Rear of the chassis
Between front-mounting flange
and rack or cabinet edge
Between both sides of the
chassis and any
non-heat-producing surface
such as a wall or cabinet side
SRX550 Services Gateway Description on page 3
SRX550 Services Gateway Cabinet Size and Clearance Requirements on page 47
Site Preparation Checklist for the SRX550 Services Gateway on page 35
SRX550 Services Gateway Rack Size and Strength Requirements on page 43
General Site Installation Guidelines for the SRX550 Services Gateway on page 37
Recommended
Clearance
Requirement for Clearance
8.7 in. (22 cm)
Space for service personnel to remove
and install hardware components
17.4 in. (44.2 cm)
Space for service personnel to remove
and install hardware components
2.5 in. (6.35 cm)
Space for cable management and
organization
6.0 in. (15.24 cm)
Space for the cooling system to
function properly and to maintain
unrestricted airflow around the chassis
Chapter 8: Rack Requirements
45

Advertisement

Table of Contents
loading

Table of Contents