C200Hx/Hg/He Controller Link Units - Omron C200HW-CLK21 Operation Manual

Controller link units
Hide thumbs Also See for C200HW-CLK21:
Table of Contents

Advertisement

C200HX/HG/HE Controller Link Units

Note
4-3
C200HX/HG/HE Controller Link Units
1. Always turn OFF the PLC's power before setting the terminating resistance
switch.
2. Turn ON the switch to connect terminating resistance at the nodes at both
ends of the Network and turn OFF the switch at all other nodes. Normal
communication cannot be performed in the Network unless all the nodes
are set properly.
3. The TER LED indicator will light when the terminating resistance switch is
set to ON.
4. The default setting is OFF (not connected).
The following settings are required for a Controller Link Unit used with a
C200HX/HG/HE PLC.
Item
Node address
Node address switches
Baud rate
Baud rate and operating level switch, pins 1
and 2
Operating level
Baud rate and operating level switch, pin 4)
Terminating resistance
Terminating resistance switch
Section 4-3
Switch
Page
94
95
95
96
93

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents