Reconnecting The Equipment - Nortel BCM1000 Installation And Maintenance Manual

Nortel networks business communications manager installation and maintenance guide
Hide thumbs Also See for BCM1000:
Table of Contents

Advertisement

Reconnecting the equipment

After you install the module correctly into the bay, you must return the equipment to operation in
an orderly way.
Follow these steps carefully to ensure that you return your system to operation without
endangering the equipment or yourself.
Plug the power cords for the BCM1000 and the BCM1000e, if there is one, back into the ac
1
outlets.
Note: The Business Communications Manager system starts up when you connect the ac
power cord. System startup takes several minutes to complete.
Connect the cables to the proper outlets on the media bay modules and the MSC on the server.
2
Caution: Legacy DECT modules
If you have a legacy DECT module on your system: Plug the base station RJ45 cables into
the DECT module one at a time. Ensure each base station begins the startup sequence
before plugging in the next module.
Check that the LEDs on the modules are on and static. Refer to
3
status" on page 119
Test existing functions to confirm their operation.
4
Configure the module. Refer to the Business Communications Manager Programming
5
Operations Guide for details.
for a detailed description of the LED states.
Chapter 8 Installing media bay modules
"Checking system power and
Installation and Maintenance Guide
113

Advertisement

Table of Contents
loading

Table of Contents