Oil Cooler - Toro Reelmaster 2000-D Service Manual

Hide thumbs Also See for Reelmaster 2000-D:
Table of Contents

Advertisement

Oil Cooler

RIGHT
FRONT
1. Oil cooler
2. Hydraulic connector
3. O–ring
4. Bulkhead nut
o
5. 90
hydraulic fitting
6. Hose clamp
Removal (Fig. 58)
1. Park machine on a level surface, lower cutting units,
stop engine, engage parking brake, and remove key
from the ignition switch.
2. Open and remove the hood (see Traction Unit Oper-
ator's Manual). Remove the radiator screen.
3. Loosen hose clamps and remove both hydraulic
hoses from fittings on oil cooler. Allow hoses to drain oil
into a suitable container.
o
4. Remove 90
hydraulic fittings from oil cooler assem-
bly. Remove and discard o–rings from connectors.
5. Remove bulkhead nuts from oil cooler assembly.
6. Pull oil cooler from screen bracket.
7. If necessary, remove hydraulic connectors from oil
cooler.
Hydraulic System
IN
3
4
6
5
7
8
9
OUT
4
10
11
6
12 13
5
7. Hydraulic hose (from manifold)
8. Knob
9. Lock nut
10. Protective sleeve
11. Hydraulic hose (to reservoir)
12. Nut
Page 4 – 80
2
2
3
17
16
14
15
Figure 58
Installation (Fig. 58)
1. If hydraulic connectors were removed, apply hydrau-
lic sealant to threads of connectors. Install connectors
to oil cooler. Coat new o–rings with hydraulic oil. Install
new o–rings in connectors.
2. Position and secure oil cooler to screen bracket with
bulkhead nuts.
o
3. Install 90
hydraulic fittings to oil cooler assembly.
Orientate top fitting straight back and bottom fitting 45
down.
4. Install hydraulic hoses to fittings and secure with
hose clamps.
5. Install hood on the machine.
Hydraulic
Sealant
1
13. Front screen bracket
14. Flat washer
15. Lock nut
16. Flange head screw
17. Left front panel
Reelmaster 2000–D
o

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents