Tests and Measurements
............................................................................................................................................................................................................................................................
d. End-to-end stability test
Figure 3-15 End-to-end stability test example in DWDM system
Pattern
Generator
Error
Detector
e. After having checked all the channels, by CT check that all the ports under
SNCP protection check (line ports)
Purpose
Verify the SNCP protection efficiency
Test instruments [see
Craft terminal (E)
Pattern generator/error detector (A)
............................................................................................................................................................................................................................................................
PN 8DG08136CAAA
Issue 1 March 2008
On ODF, perform a physical loop (station C, user side) on all the channels with the
same bit rate. Referring to the example
are OC-192 and CH3 is 10 GbE, on ODF, perform a physical loop on CH1 and
CH2 client side in Station C.
In Station B (OADM), connect CH1 in physical pass-through.
On ODF, connect the pattern generator/error detector output to the CH1 client
input in station A, and check that the CH1 client output power (station A) is OK
(refer to
Chapter
4,
"SFP and XFP modules optical characteristics" (p.
On ODF, perform a daisy chain in station A, connecting CH1 client output to CH2
client input.
Check that the CH2 client output power (Rx value on the instrument) is OK.
Connect the CH2 client output to the pattern generator/error detector input and
start the stability test: at a given bit rate, check no errors.
CH1
STM-N
CH2
STM-N
CH3
GbE
STATION A
stability test don't have any alarm.
Table 3-1, "Instruments" (p. 3-2)
ofFigure
CH2,CH3
STATION B
SPAN 1
CH1
STM-N
Local testing and operating sequence
3-15, and assuming CH1 and CH2
SPAN 2
CH1
STM-N
]
4-16).).
STM-N
CH1
STM-N
CH2
CH3
GbE
STATION C