Alcatel-Lucent 1850 TSS-320 Turn-Up And Commissioning Manual page 46

Transport service switch
Hide thumbs Also See for 1850 TSS-320:
Table of Contents

Advertisement

Tests and Measurements
............................................................................................................................................................................................................................................................
PTx power test
........................................................................................................................................................................................................................
1
Connect power meter to the optical port output being tested.
– Check LOS alarm on Error Detector.
– Check that the optical power is within the range stated on the table reported in
........................................................................................................................................................................................................................
2
Switch off the LASER as specified in
OFF then ON" (p.
Program ALS Enabling port [see
OFF then ON" (p.
– Check that the LASER power is null.
– Check if the Tx optical power is null.
Repeat the test on each optical unit.
Preset the instrument to transmit a signal (based on the type of port used) with the
following requirements:
Bit rate
Code/interface (SFP)
Type
E
O
N D
........................................................................................................................................................
Data ports tests
GbE Transport on VC4-xV
Check GbE packets transport by means of VC4-xV (virtual concatenation)
............................................................................................................................................................................................................................................................
3 - 2 0
Chapter
4,
"SFP and XFP modules optical characteristics" (p.
4-14).
4-14)].
If the "ALS Automatic Restart" option is enabled, check if a power reset is
attempted after approximately 0 seconds. This condition must last approximately 2
seconds.
If these conditions do not occur, replace the optical unit under test.
155520 kbit/s
S-1.1, L-1.1, L-1.2
OC-3 optical
S
F
T E P S
Local testing and operating sequence
Chapter
4,
"Standard procedures to turn the laser
Chapter
4,
"Standard procedures to turn the laser
[See
Chapter 4
optical characteristics" (p. 4-16)
details.]
4-16).
,
"SFP and XFP modules
for
PN 8DG08136CAAA
Issue 1 March 2008

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents